Lake Compounce · US & Canada · typical hours 11 AM–6 PM
The one-minute version: be at the gate 30–45 minutes before opening and ride Boulder Dash first. Waits peak from late morning to mid-afternoon — do shows and meals then. The final hour is often as quiet as rope drop. There is no headline evening show, so the final operating hour is usually the quietest time to ride.
Worth it on busy days: Speedy Pass is a virtual queue sold by the day, Premium from $20 and Elite from $30, priced up on busy dates.
See today's live waits free Ready-made touring plansTake these waits into the park
A pass unlocks live waits at all 121 parks, alerts when a line drops, and unlimited day plans from Mila. One-time, no subscription.
Day Pass · $6.99 Trip Pass · $17.99 for 10 days
14-day refund · nothing auto-renews · Compare all passes
Queues here follow a predictable daily shape. Lines are shortest in the first hour and the last, and peak 2 PM–3 PM — that is the window to spend on shows, meals or indoor attractions rather than headliners.
Typical shape of a Lake Compounce day, shown as each hour's share of that day's own peak wait. Actual minutes vary by season and day of week — check today's live waits.
| Hour | Typical wait level |
|---|---|
| 11 AM | 30% of the day's peak |
| 12 PM | 62% of the day's peak |
| 1 PM | 91% of the day's peak |
| 2 PM | 100% of the day's peak |
| 3 PM | 87% of the day's peak |
| 4 PM | 57% of the day's peak |
| 5 PM | 30% of the day's peak |
Be at the gate 30–45 minutes before opening and ride in this order. Boulder Dash, the wooden coaster that runs along the mountainside, and Wildcat post the longest waits; Phobia Phear Coaster comes next.
The first hour is the cheapest capacity of the day — no pass, no fee, and typically the shortest waits you will see.
Red = busiest, green = quietest, grey = moderate.
Expect the year's longest waits during summer weekends and the Phantom Fall Fest weekends in October.
The best value for short lines is the early-season weekends in May and the first fall weekends in September.
Scores are the crowd forecast, 1 to 10, averaged over the stretch. Visiting in a busy stretch anyway? Be at the gate before opening, and ride the big ones in the first hour and the last. Every day is scored on the crowd calendar.
Worth it on busy days
Speedy Pass is a virtual queue sold by the day, Premium from $20 and Elite from $30, priced up on busy dates. It pays off on October Fall Fest weekends; on a summer weekday the coasters rarely need it.
Maben Parks shows every wait live with a "vs typical" marker, and your magical fairy will run the numbers for your party and date — including telling you to keep your money when the answer is no.
Check today's waits before you buyPlanning ahead? The free Lake Compounce crowd calendar scores every day for the next twelve months, 1 to 10 — no sign-up.
Median posted wait across the rides we track, on moderate days — the crowd level most visitors get. The shaded band is the middle half of readings at that hour.
Detected automatically from the live feed — each of these reported closed all day, every day, for at least three operating days. Observed through October 18, 2026.
| Attraction | Closed since | Duration |
|---|---|---|
| Croc-O-Nile | October 4, 2026 | 10 operating days |
| Down Time | October 4, 2026 | 10 operating days |
| Ghost Hunt | October 4, 2026 | 10 operating days |
| North Pole Express | October 4, 2026 | 10 operating days |
| Rev-O-Lution | October 4, 2026 | 10 operating days |
| Riptide Racer | October 4, 2026 | 10 operating days |
| Sawmill Plunge | October 4, 2026 | 10 operating days |
| Storm Surge | October 4, 2026 | 10 operating days |
| Thunder Rapids | October 4, 2026 | 10 operating days |
| Venus Vortex | October 4, 2026 | 10 operating days |
Generated from wait-feed observations, not an operator announcement: a long closure usually means refurbishment, but we report what the feed shows rather than guessing why. Always check the operator's own page before travelling for one specific ride.
Every wait we have recorded here, grouped by how busy the day turned out to be. The bold figure is the middle half of what we saw — a quarter of the time it was shorter, a quarter of the time longer. Read it against today’s crowd level to know whether the number on the sign is good or bad.
| Ride | Mildlevel 2 | Moderatelevel 3 | Packedlevel 5 |
|---|---|---|---|
| Wildcat | 10–1010 typical | 10–1010 typical | 10–4010 typical |
| Boulder Dash | 10–1010 typical | 10–1010 typical | 10–3510 typical |
| Phobia Phear Coaster | 5–55 typical | 5–55 typical | 10–2010 typical |
| Project Nightmare | 10–1010 typical | 10–1010 typical | 5–205 typical |
| Zoomerang | 5–55 typical | 5–55 typical | 10–1010 typical |
Minutes of posted standby wait, from our own recorded snapshots — up to 4 days per figure. Cells stay blank until a ride has enough observations at that crowd level to be worth printing. Posted waits are what the park displays, which is not always what you queue.
Aim to be at the gate 30–45 minutes before the posted opening time of 11 AM. The first hour consistently has the day's shortest waits, and arriving even 45 minutes late typically costs you two headliners.
11 AM–12 PM and 5 PM–6 PM — the opening hour and the final hour of the operating day. Waits peak 2 PM–3 PM, so plan meals, shows and indoor attractions for that window.
Boulder Dash, then Wildcat and Phobia Phear Coaster. Boulder Dash, the wooden coaster that runs along the mountainside, and Wildcat post the longest waits; Phobia Phear Coaster comes next.
May and September — the early-season weekends in May and the first fall weekends in September. Avoid July, August and October, when summer weekends and the Phantom Fall Fest weekends in October.
Speedy Pass is a virtual queue sold by the day, Premium from $20 and Elite from $30, priced up on busy dates. It pays off on October Fall Fest weekends; on a summer weekday the coasters rarely need it.