Knott's Berry Farm · California · typical hours 10 AM–10 PM
The one-minute version: be at the gate 30–45 minutes before opening and ride HangTime first. Waits peak from late morning to mid-afternoon — do shows and meals then. The final hour is often as quiet as rope drop. There is no headline evening show, so the final operating hour is usually the quietest time to ride.
Worth it on busy days: Fast Lane pays off on Scary Farm nights and summer Saturdays and almost never otherwise.
See today's live waits free Ready-made touring plans31 rides open, 30 closed · average posted wait 23 min, 15 min above typical.
| Attraction | Posted wait |
|---|---|
| HangTime 75 above typical | 90 min |
| GhostRider 15 above typical | 75 min |
| Jaguar! 55 above typical | 60 min |
| Silver Bullet 55 above typical | 60 min |
| Xcelerator The Ride® 55 above typical | 60 min |
| Pony Express 30 above typical | 45 min |
| Inked 15 below typical | 30 min |
| La Revolucion 25 above typical | 30 min |
| Unearthed | 30 min |
| Los Voladores 20 above typical | 25 min |
| Calico Mine Ride 5 above typical | 20 min |
| Sierra Sidewinder 15 above typical | 20 min |
| Cinema Slasher 15 below typical | 15 min |
| Eight Fingers Nine: The Boogeyman 10 above typical | 15 min |
| Mary - The Haunting of Worth Home 15 below typical | 15 min |
| MonteZOOMa: The Forbidden Fortress 10 above typical | 15 min |
| Origins: The Curse of Calico | 15 min |
| Room 13 10 above typical | 15 min |
| Sol Spin 10 above typical | 15 min |
| The Zoo 10 above typical | 15 min |
| Timber Mountain Log Ride | 15 min |
| Widows | 15 min |
| Chilling Chambers | 5 min |
| Supreme Scream | 5 min |
| Dragon Swing | 0 min |
| Hat Dance | 0 min |
| Pacific Scrambler | 0 min |
| Sky Cabin | 0 min |
| Surfside Gliders | 0 min |
| Wheeler Dealer Bumper Cars | 0 min |
| Wipeout | 0 min |
Closed right now: Balloon Race, Banzai Falls, Beach House Slides, Beagle Express Railroad, Butterfield Stagecoach, Calico Railroad, Calico River Rapids, Camp Snoopy's Off-Road Rally, CarnEVIL, Carrusel de California, Charlie Brown's Kite Flyer, Coast Rider, Flying Ace, Forsaken Lake, Ghost Town Streets, Gremmie Lagoon, Knott's Bear-y Tales: Return to the Fair, Laguna Storm Watch Tower, Linus Launcher, Malibu Run, Old Man Falls, Pig-Pen's Mud Buggies, Rapid River Run, Shore Break, Snoopy’s Tenderpaw Twister Coaster, Sunset River, The Gauntlet, The Gore-ing '20s, The Wedge, Tidal Wave Bay.
Posted waits as of 10:58 PM park time, refreshed every few minutes. Posted waits are the park’s own figures via Queue-Times.com. Plan around them in the app →
Take these waits into the park
A pass unlocks live waits at all 121 parks, alerts when a line drops, and unlimited day plans from Mila. One-time, no subscription.
Day Pass · $6.99 Trip Pass · $17.99 for 10 days
14-day refund · nothing auto-renews · Compare all passes
Knott's Berry Farm is open year-round, but its hours change by day and season and are posted on the park's official calendar. On Knott's Scary Farm nights (select nights from mid-September through October 31) the park closes early to daytime guests, typically late afternoon, and reopens in the evening as the separately ticketed Halloween event.
| Day | Park hours (local time) |
|---|---|
| Thu 22 Oct | 10 AM – 5:30 PM Knott's Scary Farm from 7 PM (separate ticket) |
| Fri 23 Oct | 10 AM – 5:30 PM Knott's Scary Farm from 7 PM (separate ticket) |
| Sat 24 Oct | 9 AM – 5 PM Knott's Scary Farm from 7 PM (separate ticket) |
| Sun 25 Oct | 9 AM – 5 PM Knott's Scary Farm from 7 PM (separate ticket) |
| Mon 26 Oct | 10 AM – 6 PM |
| Tue 27 Oct | 10 AM – 6 PM |
| Wed 28 Oct | 10 AM – 6 PM |
From the park’s published schedule. Hours change, and evening events can close the park to day guests early — check with the park before you go.
Knott's Berry Farm is a theme park on Beach Blvd in Buena Park, California, now operated by Six Flags, that grew out of the Knott family's berry farm, where the boysenberry was first grown and sold commercially, and Mrs. Knott's Chicken Dinner Restaurant, which opened in 1934. Walter Knott built Ghost Town to entertain guests waiting for the restaurant, and today the park also includes the PEANUTS-themed Camp Snoopy and a coaster lineup led by GhostRider, Xcelerator The Ride, HangTime and Silver Bullet.
| Ride | Min. height |
|---|---|
| GhostRider · wooden coasterThe park bills it as the West's longest, tallest and fastest wooden coaster; it is one of the rides included with Fast Lane. | 48 in (122 cm) |
| Xcelerator The Ride · launched coasterHydraulic launch from 0 to 82 mph in 2.3 seconds, then up 205 feet before a near-vertical drop. | 52 in (132 cm) |
| HangTime · dive coasterTowers 150 feet over the Boardwalk; the park lists a 77 in maximum height and calls its drop the steepest in California. | 48 in (122 cm) |
| Silver Bullet · inverted coasterClimbs to 146 feet with a 109-foot first drop; its 54 in minimum is the highest of these headline rides. | 54 in (137 cm) |
| MonteZOOMa: The Forbidden Fortress · launched coasterThe reimagined Montezooma's Revenge, back after closing in 2022; launches 0 to 55 mph in 3 seconds and lists a 79 in maximum height. | 48 in (122 cm) |
| Calico River Rapids · water rideRiver rapids ride in the park's Fast Lane lineup. | 46 in (117 cm) |
| Timber Mountain Log Ride · water rideLog flume; riders 36 in (91 cm) and up can ride with an accompanying rider. | 46 in (117 cm) |
| Calico Mine Ride · dark rideMine-themed ride; check the official ride page for its current height rule. | — |
Height minimums as the park publishes them; some rides also have a maximum or need a companion below a second height. Check the ride's sign on the day.
Checked 2026-10-11 against the park’s published information.
Queues here follow a predictable daily shape. Lines are shortest in the first hour and the last, and peak 3 PM–5 PM — that is the window to spend on shows, meals or indoor attractions rather than headliners.
Typical shape of a Knott's Berry Farm day, shown as each hour's share of that day's own peak wait. Actual minutes vary by season and day of week — check today's live waits.
| Hour | Typical wait level |
|---|---|
| 10 AM | 30% of the day's peak |
| 11 AM | 45% of the day's peak |
| 12 PM | 65% of the day's peak |
| 1 PM | 82% of the day's peak |
| 2 PM | 95% of the day's peak |
| 3 PM | 100% of the day's peak |
| 4 PM | 100% of the day's peak |
| 5 PM | 92% of the day's peak |
| 6 PM | 78% of the day's peak |
| 7 PM | 60% of the day's peak |
| 8 PM | 42% of the day's peak |
| 9 PM | 30% of the day's peak |
Be at the gate 30–45 minutes before opening and ride in this order. HangTime and Xcelerator have the slowest throughput; GhostRider's line grows steadily through the morning.
The first hour is the cheapest capacity of the day — no pass, no fee, and typically the shortest waits you will see.
Red = busiest, green = quietest, grey = moderate.
Expect the year's longest waits during the summer holiday and Knott's Scary Farm, which sells out many October nights.
The best value for short lines is January and February weekdays, early May and November outside holidays.
Scores are the crowd forecast, 1 to 10, averaged over the stretch. Visiting in a busy stretch anyway? Be at the gate before opening, and ride the big ones in the first hour and the last. Every day is scored on the crowd calendar.
Separate evening ticket
Selected nights with a separate ticket; the park closes to day guests before it starts.
This year: 17 September to 31 October, on selected nights.
Visiting by day on an event night? Plan to finish by late afternoon, and check which nights are event nights.
Worth it on busy days
Fast Lane pays off on Scary Farm nights and summer Saturdays and almost never otherwise. Knott's is a locals' park with a very peaky calendar — check a live wait before you buy at the gate.
Looking for a fast pass or skip-the-line pass or express pass? At Knott's Berry Farm it is called Fast Lane: A paid add-on, sold separately from park admission, that lets you bypass the regular lines on select rides and attractions such as Calico River Rapids, HangTime and GhostRider; season passes add an All Season Fast Lane option, and Scary Farm sells its own Fright & Fast Lane.
Price: roughly $50–$150 unlimited wristband. Prices change often and by date — treat this as a range, not a quote.
Maben Parks shows every wait live with a "vs typical" marker, and your magical fairy will run the numbers for your party and date — including telling you to keep your money when the answer is no.
Check today's waits before you buyPlanning ahead? The free Knott's Berry Farm crowd calendar scores every day for the next twelve months, 1 to 10 — no sign-up.
Median posted wait across the rides we track, on moderate days — the crowd level most visitors get. The shaded band is the middle half of readings at that hour.
Detected automatically from the live feed — each of these reported closed all day, every day, for at least three operating days. Observed through October 23, 2026.
| Attraction | Closed since | Duration |
|---|---|---|
| Banzai Falls | September 9, 2026 | 45 operating days |
| Beach House Slides | September 9, 2026 | 45 operating days |
| Gremmie Lagoon | September 9, 2026 | 45 operating days |
| Laguna Storm Watch Tower | September 9, 2026 | 45 operating days |
| Malibu Run | September 9, 2026 | 45 operating days |
| Old Man Falls | September 9, 2026 | 45 operating days |
| Shore Break | September 9, 2026 | 45 operating days |
| Sunset River | September 9, 2026 | 45 operating days |
| The Wedge | September 9, 2026 | 45 operating days |
| Tidal Wave Bay | September 9, 2026 | 45 operating days |
| Ghost Town Streets | October 5, 2026 | 19 operating days |
| The Gauntlet | October 5, 2026 | 19 operating days |
| CarnEVIL | October 20, 2026 | 4 operating days |
| Forsaken Lake | October 20, 2026 | 4 operating days |
| The Gore-ing '20s | October 20, 2026 | 4 operating days |
| Attraction | Was closed from | Duration |
|---|---|---|
| GhostRider | September 9, 2026 | 8 operating days |
| Chilling Chambers | October 20, 2026 | 3 operating days |
| Cinema Slasher | October 20, 2026 | 3 operating days |
| Eight Fingers Nine: The Boogeyman | October 20, 2026 | 3 operating days |
| Inked | October 20, 2026 | 3 operating days |
| Knott's Bear-y Tales: Return to the Fair | September 22, 2026 | 3 operating days |
Generated from wait-feed observations, not an operator announcement: a long closure usually means refurbishment, but we report what the feed shows rather than guessing why. Always check the operator's own page before travelling for one specific ride.
Every wait we have recorded here, grouped by how busy the day turned out to be. The bold figure is the middle half of what we saw — a quarter of the time it was shorter, a quarter of the time longer. Read it against today’s crowd level to know whether the number on the sign is good or bad.
| Ride | Lightlevel 1 | Moderatelevel 3 | Packedlevel 5 |
|---|---|---|---|
| GhostRider | 0–55 typical | 10–4530 typical | 45–9075 typical |
| HangTime | 0–55 typical | 5–2010 typical | 5–6030 typical |
| Xcelerator The Ride® | 0–50 typical | 0–255 typical | 0–6025 typical |
| Inked | — | — | 30–6045 typical |
| Silver Bullet | 0–55 typical | 5–55 typical | 5–4515 typical |
| Pony Express | 5–55 typical | 5–155 typical | 5–3515 typical |
| Timber Mountain Log Ride | 0–155 typical | 5–1515 typical | 5–3515 typical |
| Coast Rider | 5–55 typical | 5–55 typical | 5–3015 typical |
| Jaguar! | 0–50 typical | 0–55 typical | 5–3015 typical |
| Calico Mine Ride | 0–50 typical | 5–155 typical | 5–3015 typical |
| Knott's Bear-y Tales: Return to the Fair | 5–55 typical | 5–105 typical | 5–3015 typical |
| Sierra Sidewinder | 0–50 typical | 0–155 typical | 5–3015 typical |
| Cinema Slasher | — | — | 5–3030 typical |
| Mary - The Haunting of Worth Home | — | — | 5–3015 typical |
| Origins: The Curse of Calico | — | — | 5–3015 typical |
| Unearthed | — | — | 15–3030 typical |
| Calico River Rapids | 0–55 typical | 5–155 typical | 5–205 typical |
| MonteZOOMa: The Forbidden Fortress | 0–55 typical | 5–55 typical | 5–205 typical |
Minutes of posted standby wait, from our own recorded snapshots — up to 28 days per figure. Cells stay blank until a ride has enough observations at that crowd level to be worth printing. Posted waits are what the park displays, which is not always what you queue.
Aim to be at the gate 30–45 minutes before the posted opening time of 10 AM. The first hour consistently has the day's shortest waits, and arriving even 45 minutes late typically costs you two headliners.
10 AM–11 AM and 9 PM–10 PM — the opening hour and the final hour of the operating day. Waits peak 3 PM–5 PM, so plan meals, shows and indoor attractions for that window.
HangTime, then Xcelerator the Ride and GhostRider. HangTime and Xcelerator have the slowest throughput; GhostRider's line grows steadily through the morning.
January, February, May and November — January and February weekdays, early May and November outside holidays. Avoid July, August, September and October, when the summer holiday and Knott's Scary Farm, which sells out many October nights.
Fast Lane pays off on Scary Farm nights and summer Saturdays and almost never otherwise. Knott's is a locals' park with a very peaky calendar — check a live wait before you buy at the gate.
Knott's Berry Farm is open year-round, but opening and closing times vary by day and season, and the park closes early to daytime guests on Knott's Scary Farm nights in September and October. Check this week's hours on this page or the park's official calendar before you go.
Yes. Knott's skip-the-line product is called Fast Lane, a paid add-on (not included with admission) that bypasses the regular lines on select rides such as GhostRider, HangTime and Calico River Rapids.
No. Knott's Scary Farm is a separately ticketed nighttime event, and daytime guests must leave before it opens; the event is not recommended for children under 13.